Jan of 2017

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 60MW
Equipment Maker: ABB and WEG
Product Description Change-out of a stator and overhaul of rotor, testing and commissioning

March of 2017

Project Percentage: 100%
Product/Equipment: Turbo Generator. Foriegn Technical Advisor - required by customer
Load Capacity: 30MW
Equipment Maker: ABB
Product Description PMS and overhaul of generator, including rotor out, cooling system overhaul, testing and alignment, re-assembly and commissioning

April of 2017

Project Percentage: 100%
Product/Equipment: Turbo Generator Rotor Cradle
Load Capacity: 30 Tons Load
Equipment Maker: Design and fabrication
Product Description Customize design and fabricate of Turbo Generator Rotor Support Cradle

June of 2018

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Pullout generator rotor and ready for air shipment

Feb of 2019

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description installation and re-assemble of generator rotor, Testing and commissioning

Oct of 2017

Project Percentage: 100%
Product/Equipment: Gas turbine/ Generator
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Major C-Inspection of a gas turbine/generator. Fully rotor out and removal of rotor fan blades, overhaul of cooling systems, cleaning of stator and rotor assy, assist in disassembly of gearbox and gas turbine assy. Run test and alignment, re-assemble and commissioning.

Feb of 2018

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Major C-Inspection. Including rotor fully out, testing and cleaning of rotor and stator assembly, removal of retaining rings and inspection, overhaul of cooling system, re-assembly of generator and commissioning.

June of 2018

Project Percentage: 100%
Product/Equipment: Turbo Generator. foriegn Technical Advisor - required by customer
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Major C-Inspection. Include assist in disassembly and re-assembly of gas turbine unit

Sept of 2018

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Major C-Inspection. Fully rotor out and removal of rotor fan blades, overhaul of cooling systems, cleaning of stator and rotor assy, assist in disassembly of gearbox and gas turbine assy. Run test and alignment, re-assemble and commissioning.

Sept of 2018

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Major C-Inspection. Fully rotor out and removal of rotor fan blades, overhaul of cooling systems, cleaning of stator and rotor assy, assist in disassembly of gearbox and gas turbine assy. Run test and alignment, re-assemble and commissioning.

July to Oct 2018

Project Percentage: 100%
Product/Equipment: Steam Turbine and Generator
Load Capacity: 2 X 135MW
Equipment Maker: ALSTOM
Product Description Steam turbine rectification works – technical and compliance oversight services

Nov of 2018

Project Percentage: 100%
Product/Equipment: Steam turbines, ESP, Heat exchangers
Load Capacity: 2 X 135MW12.5MW , 25MW
Equipment Maker: Thermax
Product Description Technical services of a major long shutdown. Scope includes general PMS - steam turbines, ESP cleaning, Heat Exchangers/Oil Coolers overhaul

Oct 2018 to Feb 2019

Project Percentage: 100%
Product/Equipment: Spare Turbo Generator Rotor
Load Capacity: 300MW
Equipment Maker: GE
Product Description Full rewind of turbo generator. Includes removal of all components and replacement of new coils, etc. testing and commissioning

August of 2019

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Full complete rewind. Including building of rotor clean room, unstriping all components and replacing with new coils, etc. testing and commissioining

Nov 0f 2019

Project Percentage: 100%
Product/Equipment: Clean Room for Generator
Load Capacity: 72MW
Equipment Maker:
Product Description Refurbishment of turbo generator clean room

Jan of 2020

Project Percentage: 100%
Product/Equipment: Clean Room for GeneratorCirculating Water Pump (CWP)
Load Capacity: 2 x 1600KW
Equipment Maker: HYOSUNG
Product Description Full inspection of pump assembly and motor, replaced wornout components, conduct complete alignment, testing and commissioning

Jan of 2020

Project Percentage: 100%
Product/Equipment: Condensate Extraction Pump (CEP) (CWP)
Load Capacity: 2 x 500KW
Equipment Maker: HYOSUNG
Product Description Full inspection of pump assembly and motor, replaced wornout components, conduct complete alignment, testing and commissioning

Feb of 2020

Project Percentage: 100%
Product/Equipment: Turbo Generator (CWP)
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Major inspection of turbo generator, replaced all wornout parts and conducted balancing alignment, testing and commissioning

Feb of 2020

Project Percentage: 100%
Product/Equipment: Turbo Generator (CWP)
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Major inspection of turbo generator, replaced all wornout parts and conducted balancing alignment, testing and commissioning

Jan of 2019

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Major C-Inspection of a turbo generator. Fully rotor out and removal of rotor fan blades, overhaul of cooling systems, cleaning of stator and rotor assy, assist in disassembly of gearbox and gas turbine assy. Run test and alignment, re-assemble and commissioning.

May of 2020

Project Percentage: 100%
Product/Equipment: Sea Water Pump (SWP)
Load Capacity: 1 x 200KW
Equipment Maker: IBARA
Product Description Complete inspection/ overhaul Including minor buil-up and machining of damage components, testing and commissioning

June of 2020

Project Percentage: 100%
Product/Equipment: Sea Water Pump (SWP)
Load Capacity: 1 x 200KW
Equipment Maker: IBARA
Product Description Complete inspection repair. Including buil-up and machining of damage components e.g impeller, shafting, testing and commissioning

Oct of 2020

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 1 x 200KW
Equipment Maker: ABB/ALSTOM
Product Description Major C-Inspection of a turbo generator. Fully rotor out and removal of rotor fan blades, removal of retaining ring, overhaul of cooling systems, cleaning of stator and rotor assy, assist in disassembly of gearbox and gas turbine assy. Run test and alignment, re-assemble and commissioning.

2020 Q4

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 1 x 200KW
Equipment Maker: ABB/ALSTOM
Product Description Major C-Inspection of a turbo generator. Fully rotor out and removal of rotor fan blades, overhaul of cooling systems, cleaning of stator and rotor assy, assist in disassembly of gearbox and gas turbine assy. Run test and alignment, re-assemble and commissioning.

Dec of 2020

Project Percentage: 100%
Product/Equipment: Steam Turbine
Load Capacity: 30MW
Equipment Maker: Mitsui
Product Description Inspection, Supply of labor, tools, material and shop facilities for replacement of gasket at steam turbine auxilliary

Jan of 2021

Project Percentage: 100%
Product/Equipment: Electrical
Load Capacity: PM1
Equipment Maker:
Product Description White water supply electrical and works

Nov of 2020

Project Percentage: 100%
Product/Equipment: Various Pumps
Load Capacity: PM1
Equipment Maker:
Product Description Supply of various pumps for the new water treatment plant

Feb of 2021

Project Percentage: 100%
Product/Equipment: Electrical
Load Capacity: PM1
Equipment Maker:
Product Description Installation of Canvas cleaner unit, electrical works

Jan of 2021

Project Percentage: 100%
Product/Equipment: MH Crusher
Load Capacity: 1600KW
Equipment Maker:
Product Description Supply of labor, tools, equipment and services for the replacement of Inboard and Outboard Bearing of Coal Crusher A (MH CRUSHER)

Feb of 2021

Project Percentage: 100%
Product/Equipment: Sea Water Pump (SWP)
Load Capacity: 1 x 200KW
Equipment Maker: IBARA
Product Description Technical services for replacement of sacrificatial wear ring. Fabrication of wear ring, conduct runout of the impeller, shaftings, testing and commissioning

July of 2021

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Major C-Inspection of a turbo generator. Fully rotor out and removal of rotor fan blades, removal of retaining ring, overhaul of cooling systems, cleaning of stator and rotor assy, assist in disassembly of gearbox and gas turbine assy. Run test and alignment, re-assemble and commissioning.

July of 2021

Project Percentage: 3 year contract
Product/Equipment: Technical Service Contract
Load Capacity:
Equipment Maker:
Product Description Supply of technical skilled technitians and engineers to 3 Hydro Electric Power Plant

August of 2019

Project Percentage: 100%
Product/Equipment: Low Grade Crystalizer
Load Capacity:
Equipment Maker:
Product Description Repair and overhaul of low grade crystalizer. Fabricate new draive shaft, reapir bronze bushings, replace new pillow block bearings, installation, alignment, testing and commissioning

Sept of 2021

Project Percentage: 100%
Product/Equipment: Fiber Opric Cable with conduit Layin
Load Capacity: 72MW
Equipment Maker:
Product Description Fiber optic cable laying from main gate to control room (approx 900M). Supply of water tight conduits and fitting accessories.

Sept of 2021

Project Percentage: 100%
Product/Equipment: PM1, PM2, and Cogen Layin
Load Capacity: 30MW
Equipment Maker:
Product Description Equipment: steam turbine, generator, IDF, BFP, auxiliaries. PMS, tools, material and manpower for the regular shutdown

Sept of 2021

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Major C-Inspection of a turbo generator. Fully rotor out and removal of rotor fan blades, removal of retaining ring, overhaul of cooling systems, cleaning of stator and rotor assy, assist in disassembly of gearbox and gas turbine assy. Run test and alignment, re-assemble and commissioning.

Jan of 2022

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Major C-Inspection of a turbo generator. Fully rotor out and removal of rotor fan blades, removal of retaining ring, overhaul of cooling systems, cleaning of stator and rotor assy, assist in disassembly of gearbox and gas turbine assy. Run test and alignment, re-assemble and commissioning.

Aug of 2022

Project Percentage: 100%
Product/Equipment: Mingler Sugar Mixers
Load Capacity: 2 units
Equipment Maker:
Product Description Repair and overhaul of damage components. Replaced all electrical systems

Oct of 2022

Project Percentage: 100%
Product/Equipment: Entrainment Pan Separator
Load Capacity: 1 unit
Equipment Maker:
Product Description Design and fabrication of entrainment for vacuum pan separator

Nov of 2022

Project Percentage: 100%
Product/Equipment: Coal Screw Conveyor
Load Capacity: 4 units
Equipment Maker:
Product Description Fabrication of coal screw conveyor. Installation and alignment. Full electrical system setup

Nov of 2022

Project Percentage: 100%
Product/Equipment: Coal Bunker Lining
Load Capacity: 4 units
Equipment Maker:
Product Description Design and fabrication and installation of coal bunker linings

Dec of 2022

Project Percentage: 100%
Product/Equipment: Induced Draft Fan
Load Capacity: 1 unit
Equipment Maker:
Product Description Reassembly and repair of IDF including fabrication of IDF Dampers and shroud

Feb of 2023

Project Percentage: 100%
Product/Equipment: Vertical Fire Pump
Load Capacity: 2 units
Equipment Maker:
Product Description Refurbishment of vertical turbine fire pump, repair of damage parts, installation and commissioning. Repair of electrical and control panel.

Aug to Sept 2023

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Major C-Inspection of a turbo generator. Fully rotor out and removal of rotor fan blades, overhaul of cooling systems, cleaning of stator and rotor assy, assist in disassembly of gearbox and gas turbine assy. Run test and alignment, re-assemble and commissioning.

Maintenance contract up Dec 2025

Project Percentage: 100%
Product/Equipment: Hydro Turbine-Generator
Load Capacity: 600MW
Equipment Maker:
Product Description PMS contract for until December 2025. Coverage: all hydro turbine-generators, large pumps, hydraulic

June of 2024

Project Percentage: 100%
Product/Equipment: Steam Turbine
Load Capacity: 100 MW
Equipment Maker:
Product Description Major C-Inspection of steam turbine and generator. Fully rotor out and removal of rotor fan blades, overhaul of cooling systems, cleaning of stator and rotor assy, assist in disassembly of gearbox and gas turbine assy. Run test and alignment, re assemble and commissioning.

Nov-Dec 2024

Project Percentage: 100% (3 projects simulteneous)
Product/Equipment: Coal Feeder Gates and Auxilliaries, Mill Silo and Raw Coal Feeder Gates, Mill Tube and Accessories
Load Capacity: 1,200MW
Equipment Maker:
Product Description PMS, overhaul, repalce worn-out parts, cleaning, alignment, assembly, testing and commissioning

Jan of 2025

Project Percentage: 100%
Product/Equipment: Turbo Generator
Load Capacity: 72MW
Equipment Maker: ABB/ALSTOM
Product Description Major C-Inspection of a turbo generator. Fully rotor out and removal of rotor fan blades, overhaul of cooling systems, cleaning of stator and rotor assy, assist in disassembly of gearbox and gas turbine assy. Run test and alignment, re-assemble and commissioning.